Skip to content
FutureHubs.eu
The Graslei quay in Ghent, with historic guild houses, a clock tower, café terraces and small boats moored on the Leie

Belgium

Ghent

Photo: Michielverbeek, CC BY-SA 4.0, Wikimedia Commons

Ghent is pushing affordable housing through its Woonpact and Houtdok plans, desealing soil under the EU-funded REWILD project and extending its fossil-free partnership with Ghent University.

Updated · Checked against official sources

  • Population

    273,790

    1 January 2026

  • Mayor

    Mathias De Clercq

    Voor Gent

  • EU programmes

    4

Latest

  1. Mobility ·

    Ghent opens new bike-share permits and aims to double trips by 2030

    Ghent will open new bike-share permits from November, licensing two operators from next year with up to 1,250 bikes each, as it aims to double shared-bike trips from about 1.25 million last year to 2.5 million by 2030.

    Facts and source
    • Ghent aims to double shared-bike trips from about 1.25 million last year to 2.5 million by 2030.
    • There will be one permit for conventional bikes and one for electric bikes, each allowing up to 1,250 bikes.
    • Shared-bike trips rose from 242,000 in 2022 to 1.24 million in 2025.

    Source: Stad Gent, “Gent mikt op dubbel zoveel ritten met deelfietsen tegen 2030”

    Read with context →
  2. Mobility ·

    Ghent sets aside €4.46 million for a social mobility budget against transport poverty

    From 1 May 2027, Ghent will give low-income households a social mobility budget for car sharing, bike sharing, bikes and commuting, with €4.46 million reserved until 2031 and about 11,000 households expected to qualify.

    Facts and source
    • Low-income households can use the social mobility budget from 1 May 2027.
    • The city has reserved €4.46 million for the scheme, which runs from mid-2027 to the end of 2031.
    • About 11,000 households are estimated to be eligible.

    Source: Stad Gent, “Nieuw sociaal mobiliteitsbudget om vervoersarmoede aan te pakken”

    Read with context →
  3. Culture ·

    Design Museum Gent reopens after four years with a new wing and a city-wide festival

    Design Museum Gent reopens on Saturday 3 October after four years of renovation and a new wing, with free entry on 3 and 4 October and more than 120 Design Fest Gent activities across Ghent until 11 October.

    Facts and source
    • Design Museum Gent reopened on Saturday 3 October after four years of renovation and the construction of a new wing.
    • More than 120 activities took place across the city until 11 October.
    • Entry to the museum and all exhibitions was free on 3 and 4 October.

    Source: Stad Gent, “120 activiteiten over de hele stad: Design Museum Gent klaar voor grote heropening”

    Read with context →
  4. Climate and energy ·

    Ghent and Ghent University extend their fossil-free city partnership

    Ghent and Ghent University have extended their Gent Fossielvrij partnership for three years, with a possible three-year extension, to keep testing solutions for a fossil-free Ghent by 2050, starting with heat pump noise and apartment heating.

    Facts and source
    • The Gent Fossielvrij partnership continues for three years, with a possible three-year extension.
    • Since 2021 the city and the university have worked together on making Ghent fossil-free by 2050.
    • A joint analysis found that 54% of homes in the Vogelhoek district are suitable for prefabricated renovation.

    Source: Stad Gent, “Stad Gent en UGent werken samen verder aan een fossielvrij Gent”

    Read with context →
  5. Regeneration and housing ·

    Six private developers answer the first call of Ghent's affordable housing pact

    Six private partners answered the first call of Ghent's Woonpact, which closed on 1 September 2026, with proposals for 400 to 500 homes, of which 160 to 200 would be social or budget rentals.

    Facts and source
    • Six private partners submitted proposals in the first Woonpact call, together worth 400 to 500 homes.
    • Between 160 and 200 of these would be social or budget rental homes.
    • The Woonpact asks private owners to provide at least 40% affordable rentals on their own land.

    Source: Stad Gent, “Zes private partners dienen project in binnen Woonpact”

    Read with context →

City briefs are drafted with AI from official sources; every fact is matched automatically against the source text before publication, without an editor approving it first.

Projects we track

5 projects · 2 under way

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    REWILD: Fast Forward: Rewild The City

    An EU Innovative Action that tests soil desealing on public and private land in three vulnerable neighbourhoods, aiming at no net land take. It runs from December 2024 to May 2028.

    Budget EUR 4,999,488.16 (ERDF granted) Funded by European Urban Initiative (ERDF) Climate and energy

    Status checked 20 October 2026 · Source

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    Houtdok urban district

    The layout plan for the former Houtdok dock area is ready: 70% of the site is for housing, at least 40% of homes will be budget or social rentals, and the site will be largely car-free.

    Regeneration and housing

    Status checked 20 October 2026 · Source

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    Proactive public services platform (Bloomberg Mayors Challenge)

    Ghent was one of 24 winners of the Bloomberg Philanthropies Mayors Challenge and will build, over two years, a digital platform that tells residents about the benefits they are entitled to, starting with expectant parents.

    Budget USD 1 million Funded by Bloomberg Philanthropies Digital government

    Status checked 20 October 2026 · Source

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    Meibloem site park, Brugse Poort

    A long-vacant former bowling and furniture site in Brugse Poort becomes a park with neighbourhood facilities; demolition is set for 2027, the sports hall is renovated in 2027-2028 and first greening follows in 2029.

    Regeneration and housing

    Status checked 20 October 2026 · Source

    1. Planned
    2. Funded
    3. Under way
    4. Completed

    NEUTRALPATH positive energy district, Muide-Meulestede

    One of three European projects the city currently runs with Ghent University's EnerGhentIC network, developing a positive energy district in Muide-Meulestede.

    Climate and energy

    Status checked 20 October 2026 · Source

EU programmes and networks

From the archive

Other cities in Belgium

City hall press releases Subscribe (RSS) All cities