Switzerland
Zurich
Zurich is buying homes towards its goal of one non-profit rental in three by 2050, turning street space into greenery, walking and cycling space, preparing a 365-franc annual transit pass and paying half the cost of e-cargo bikes for businesses.
Updated · Checked against official sources
-
Population (end of 2025)
452,421, the highest ever
2025
-
Mayor (Stadtpräsident)
Raphael Golta, since the 2026-2030 term began
-
EU programmes
2
Latest
-
Regeneration and housing ·
Zurich to redesign Enge harbour promenade as green lakeside public space
Zurich will start redesigning the Enge harbour promenade in January 2027, moving 127 parking spaces to a car park opposite and raising the number of trees to 140, with works due to finish in stages by spring 2030.
Read with context →Facts and source
- The 127 public parking spaces on the harbour embankment will move to the Hafen Enge car park opposite at the end of December 2026.
- Around 60 new climate-resilient trees will be planted, bringing the total to 140.
- Construction starts in January 2027 and will proceed in stages until spring 2030.
Source: Zurich city hall, “Baubeginn am Hafen Enge: Am See entsteht eine neue grüne Flaniermeile”
-
Regeneration and housing ·
Zurich lends 10.5 million francs to cut rents for young trainees
Zurich's city council has granted the youth housing foundation JUWO interest-free loans of 10.5 million francs, cutting rents by about 11 per cent for 163 places for people in training under 30 at two estates.
Read with context →Facts and source
- The loans will reduce the rent of 163 housing places for young people in training.
- The foundation receives a total of 10.5 million francs from the 2025 youth housing credit.
- The flats may only be let to people in training who are under 30.
Source: Zurich city hall, “Stadtrat vergünstigt Wohnraum für junge Erwachsene in Ausbildung”
-
Mobility ·
Zurich pays half the cost of e-cargo bikes for businesses
Zurich has launched «CarGoVelo für Züri», a programme that pays half the purchase cost of an electric cargo bike for companies and organisations, with a total budget of 390,000 francs available for a maximum of three years.
Read with context →Facts and source
- The city covers half the purchase cost of an e-cargo bike for companies and organisations.
- The city also pays for a service after one year and up to 1,000 francs towards lettering on the bike.
- The programme runs until its 390,000-franc budget is used up, for a maximum of three years.
Source: Zurich city hall, “Die Stadt unterstützt den Kauf von E-Cargovelos für gewerbliche Nutzungen”
-
Climate and energy ·
Zurich expands mobile recycling centre to 33 sites and retires disposal tram
Zurich is retiring its disposal tram after more than 85 years, with a last stop in Hirzenbach on 20 October 2026, as its mobile recycling centre expands to 33 locations by early 2027, adding 22 sites the tram never reached.
Read with context →Facts and source
- The expansion of the mobile recycling centre to 33 locations across Zurich will be completed by early 2027.
- The disposal tram is being retired and makes its last stop in Hirzenbach on Tuesday 20 October 2026.
- About 500 people visit each four-hour session, roughly half of whom also use the swap area or repair advice.
Source: Zurich city hall, “Mobiler Recyclinghof hält ab 2027 stadtweit an 33 Standorten”
-
Regeneration and housing ·
Zurich buys 64 flats in Seebach for 78.22 million francs
Zurich's city council has decided to buy a site in Seebach with 12 apartment buildings and 64 flats for 78.22 million francs, a step towards making one third of the city's rental flats non-profit by 2050.
Read with context →Facts and source
- The city is acquiring a site in Seebach with 12 apartment buildings and 64 flats for 78.22 million francs.
- The purchase supports the city's goal that one third of rental flats are non-profit by 2050.
- Unused building rights would allow at least twice the current living space in future.
Source: Zurich city hall, “64 Wohnungen in Seebach werden städtisch”
City briefs are drafted with AI from official sources; every fact is matched automatically against the source text before publication, without an editor approving it first.
Projects we track
6 projects · 1 completed · 4 under way
-
- Planned
- Funded
- Under way
- Completed
Street space for walking, cycling, public transport and greenery
After the 2024 votes, the city must convert 462,000 m² of street space to walking, cycling and public transport and green a further 145,000 m² by 2035; after the first year (May 2025 to April 2026) it had reached 33.3% of the greening target and 8.3% of the transport target.
Funded by Stadt Zürich MobilityStatus checked 21 October 2026 · Source
-
- Planned
- Funded
- Under way
- Completed
365-franc annual public transport pass
Following the September 2025 popular vote, the City Council has proposed discounting annual passes for zone 110 and the GA travelcard for residents to 365 francs for adults and 185 francs for children and young people; the City Parliament now has a year to decide.
Budget CHF 195 million a year (requested) Funded by Stadt Zürich MobilityStatus checked 21 October 2026 · Source
-
- Planned
- Funded
- Under way
- Completed
Purchase of 64 homes in Seebach
The city is buying a site in Seebach with 12 apartment buildings and 64 homes for at least 156 people, towards its goal that one rental home in three be non-profit by 2050; the land can later hold at least twice today's floor space.
Budget CHF 78.22 million Funded by Stadt Zürich Regeneration and housingStatus checked 21 October 2026 · Source
-
- Planned
- Funded
- Under way
- Completed
CarGoVelo für Züri: e-cargo bike subsidy
Launched in October 2026, the programme pays half the purchase price of an e-cargo bike for businesses and organisations, plus a first-year service and up to 1,000 francs for lettering, for at most three years or until the budget runs out.
Budget CHF 390,000 Funded by Stadt Zürich MobilityStatus checked 21 October 2026 · Source
-
- Planned
- Funded
- Under way
- Completed
Integration policy goals 2026-2030
The City Council adopted 20 integration goals under the title "Zürich ist gelebte Vielfalt", grouped in five strands, with preventing discrimination as a strand of its own for the first time and digitalisation added as a theme.
InclusionStatus checked 21 October 2026 · Source
-
- Planned
- Funded
- Under way
- Completed
Mobile recycling centre, citywide
Started as a pilot at four sites in 2022, the mobile recycling centre, with a swap point and repair advice, will stop at 33 sites across the city by early 2027, served by electric lorries that replace the waste-collection tram.
Funded by Stadt Zürich (Entsorgung + Recycling Zürich) Climate and energyStatus checked 21 October 2026 · Source
EU programmes and networks
All our coverage
September 2026
-
· Mobility
Zurich reaches a third of its street greening target after one year
Zurich's first annual report on its voter-mandated street space targets shows that 33.3 percent of the greening target and 8.3 percent of the walking, cycling and public transport target were reached between May 2025 and April 2026. Zurich city hall